Description
Under construction with completion expected
in March 2026.
Four blocks with 14 floors each, housing a total of
251 residential units.
A variety of unit sizes ranging from 1+1 to 5+1
duplex units.
Just 10 minutes to Marmaray Metro, providing seamless
connectivity.
Only 5 minutes from the vibrant Baghdad Street and the
scenic beach.
60% of the project area is dedicated to green spaces
and amenities.
Comprehensive facilities including:
Tennis and basketball playgrounds
Children’s playground
Walking areas
Closed swimming pool
Clubs featuring a sauna, jacuzzi, and salt room
Smart systems throughout the project:
Otopark with 20 charging stations for electric cars
Solar panels for sustainable energy
Property details
Address
Loan Calculator
What's nearby?
Review (0 Review)
Contact seller
Featured listings
Featured properties
Explore all the different types of properties so you can choose the best option for you.